You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.
The re-gasification terminal (known as RGT-2) is part of Malaysia's development plan to secure stable natural gas supply for the nearby refinery and Petrochemical Integrated Development (RAPID), Pengerang Co-generation Plan (PCP) and also to the Peninsular Gas Utilization (PGU) Grid. This LNG Tank will have the capacity of 5 million tons per annual and two 200,000 cubmic meter LNG storage tank
Samsung C&T Corporation
We are satisfied with PERI formwork not only the material but also their continuous technical support at site. PERI system are versatile and easy to handle during assembly, jumping and rectifying.