With Punggol area rapidly developing, new roads and buildings are being built now and in the coming years throughout the new town. Plans to transform a part of Punggol into a digital district has been materialized and construction is underway.
Just right behind Punggol SAFRA, a Y-shaped pier bridge is being constructed over Punggol waterway - below the LRT tracks between Sam Kee Station and Punggol Point Station. The bridge aims to support new roads being built from Sentul Crescent to Punggol Seventeenth Avenue.
The project commenced in Q3 2019 and is completed in Q4 2021.
Location
Main Application
Civil Engineering
Project participants
Customer: Chye Joo Construction Pte Ltd
The Project
Impressions from the project process
Overview of Y-Shaped Pier Bridge
Completed casting of Y-Shaped Pier
Erection of PERI UP Flex Shoring for Crosshead
Extremely flexible in all three dimensions through the uniform grid size
Casting of Crosshead using PERI UP Flex Shoring and VARIO GT 24 Girder Wall Formwork
Casted Crosshead
Uniform grid size enables flexible geometries and load
View of completed Y-Shaped Pier Bridge
Overview of Y-Shaped Pier Bridge
Completed casting of Y-Shaped Pier
Erection of PERI UP Flex Shoring for Crosshead
Extremely flexible in all three dimensions through the uniform grid size
Casting of Crosshead using PERI UP Flex Shoring and VARIO GT 24 Girder Wall Formwork
Casted Crosshead
Uniform grid size enables flexible geometries and load
View of completed Y-Shaped Pier Bridge
Mr Thu Ya Nyi Lwin
Construction Manager
We are very pleased with PERI Singapore’s engineering and on-site support. The teams have responded promptly with viable solutions whenever required. We are happy to say that productivity on-site has also increased by about 30% using PERI systems (as when compared to conventional formwork).