Bishan Depot Upgrade R1012, Singapore
Bishan, Singapore
A contract for the Design and Construction of Stabling and Maintenance Workshop Extension at Bishan Depot (Contract R1012) was awarded to Gammon Construction Limited (Singapore Branch) in August 2019.
Upgrading works commenced in August 2019 and CCW 'Completion of whole of the works' is scheduled to be on 25 March 2023.
Location
Main Application
Building refurbishment
Project participants
Main Contractor: Gammon Construction Limited (Singapore Branch)
Sub-contractor: Heng Da Construction Pte Ltd
Sub-contractor: Heng Da Construction Pte Ltd
The Project
Impressions from the project process
Overview of 11.5m casted columns for Bishan Depot Upgrade R1012
VARIO GT 24 Column Formwork can be adapted to suit every cross-section, concreting height and required fresh concrete pressure
VARIO GT 24 Column Formwork Striking
Contract R1012, Design and Construction of Stabling and Maintenance Workshop Extension at Bishan Depot









Overview of 11.5m casted columns for Bishan Depot Upgrade R1012

VARIO GT 24 Column Formwork can be adapted to suit every cross-section, concreting height and required fresh concrete pressure

VARIO GT 24 Column Formwork Striking

Contract R1012, Design and Construction of Stabling and Maintenance Workshop Extension at Bishan Depot