project overview page jalan papan 01

PERI Singapore Building Projects

Form structures that stand tall

From school campus to industrial factories and warehouses, we help shape buildings that bring a city to life. With a range of climbing and formwork options to suit your requirements, our temporary works systems make it possible to construct in challenging environments.

PERI Singapore Building Projects

Addition and Alteration works for Applied Materials
The construction of the liftcores are made possible with CB240 Climbing Formwork system and PD8 Table system seen here are used for the beam.
Overview of Top Pave Project
New 2-storey industrial building at Tuas South Link - Boon Tian Factory
An overview of the entire jobsite of the JTC 9-Storey Light Industrial Development
Overview of Wave 9 industrial development
Overview of Ascent @ Gambas in May 2023
Kienta Project
An overview of the jobsite with PERI systems.
Site progression in December 2020 - 3rd lift of CB Climbing Platform
The GEAR will serve as Kajima Corporation’s Asia Pacific HQ
One KA @ Macpherson site progress: August 2023
Overview of Project Spring’s substation
Partial concrete walls of the muck pit with TRIO panels
JTC Chemical Hub
DB Factory at 42A Penjuru Road under construction
Overview - A total of 4 liftcores were required for the project
VARIO GT 24 Column Formwork with VARIO GT 24 Girder Wall Formwork at the background.
Together with PD 8 Table and ST 100 Stacking Tower systems, they are able to cast a 10 m height of slab on the 2nd floor.
Utility Block consisting of 4 levels of slab
Tuas Data Centre site overview
Nicely arranged PERI UP Rosett Flex with a complete look of the beam.
Large PD 8 Tables are designed to maximize workers' productivity resulting in lesser handling.
RedLion 2 site overview
Overview of VSMC Semiconductor site in Tampines, Singapore
Overview of site progression in August 2025
Overview of Heavy-vehicle Factory at Jalan Papan
An overview of Tenet EC site: February 2024
Site progression - April 2022
XCL World Academy’s latest Innovation Hub site progress: May 2023
Overview of Bukit Batok East Community Club
SAFRA CCK site progress: March 2022
Overview of the brand new Kallang Tennis Centre site
Overview of 11.5m casted columns for Bishan Depot Upgrade R1012
The new 6-star hotel complex was constructed around two buildings dating from the colonial times. With SKYDECK, the construction of the reinforced concrete slabs could be carried out efficiently and safely.
Commonwealth Towers
Signature at Yishun
An updated overview of Centrium Square at Serangoon Road
Condominuim at St Thomas Walk
PERI UP Rosett and PD 8 Table System are used jointly in the jobsite at the Educational block.
Cost effective shoring system that can be quickly adapted to accommodate different heights for moving under large beams.
The great wall of DUO: DUO used for shear wall
SMUX at Canning Rise
Overview of Sims Urban Oasis
DUO - the universal lightweight formwork for walls, columns and slabs
The project involves the construction of a five-storey 27,000m², 30MW data center. It includes the construction of an office facility, server rooms, administrative space and the installation of electrical and mechanical equipment, safety and security systems, and elevators.
DUO lightweight formwork was used for the column formwork of the upper storeys.
The American Las Vegas Sands Corporation is the owner of the complex the highly visible hotel towers.
SBF Center Overview
Overview
RobinsonTower_Startpage
Marina One Project
Overview of Rochester Commons – 17 storey mixed-used tower
Singapore Sports Hub
An overview of both PD 8 Table and ST 100 Stacking Tower are used on site.
Singapore Chinese Cultural Center
VARIO GT Column Formwork was used on these columns achieving smooth concrete finishing.