T3003 TBM Platform
East Coast,
Singapore
Advanced Sewer System
A special designed PERI UP platform supports the TBM (Tunnel Boring Machine) which consists of 3 parts. After the vertical break through it was lowered on a support frame which was located on top of the PERI platform to be disconnected and lifted up by a mobile crane (21 m). The total weight of the TBM was 81 tons.
Location
Main Application
Civil Engineering
Project participants
Customer: Ed. Züblin AG – Singapore Branch
The Project
Impressions from the project process
PERI systems are easy to assemble
PERI products resist high pressure on the construction site.
The dismantling of the TBM was carried out on top of the temporary platform of PERI.
Break through of TBM
SLS Spindles transfer the horizontal force into the wall
Special designed PERI UP platform to support the TBM
PERI systems are easy to assemble
PERI products resist high pressure on the construction site.
The dismantling of the TBM was carried out on top of the temporary platform of PERI.
Break through of TBM
SLS Spindles transfer the horizontal force into the wall
Special designed PERI UP platform to support the TBM
Mr Peerapat Sipongsai | Mr Jittinong Hitmengsong
Project Engineer | Site Engineer
Mantling PERI products is very easy and the quality is very good. The PERI Formwork Instructor being on site is a great benefit for us.