Warehouse @ 9 Jalan Besut
9 Jalan Besut,
Singapore
Industrial Structure
Hock Seng Heng Transport & Trading Pte Ltd is a local establish company that offers a wide range of logistics products and services located at No. 9 Jalan Besut. This is a redevelopment project for a heavy vehicle maintenance and refuelling warehouse to make space for the new 5-Storey high warehouse that will be completed by February 2018.
Location
Main Application
Industrial Structures
Project participants
Customer: Nam Aik Builders Pte Ltd
The Project
Impressions from the project process
The construction of the liftcores are made possible with CB240 Climbing Formwork system and PD8 Table system seen here are used for the beam.
An overview of the PD8 Table system being used to support as back propping for the precast plank installation and also topping up concrete casting.
Both CB 240 Climbing Formwork and VARIO GT 24 Column Formwork systems are visible on the 2nd floor of the warehouse as they are used for liftcores and staircases respectively.
An upclose view of CB 240 Climbing Formwork system in the background and VARIO GT 24 Column Formwork system in the foreground.
A closer look of CB 240 Climbing Formwork system climbing ahead of the slabs.
A liftcore for both cargo and passengers lift were seen using the PERI CB 240 Climbing Formwork system.
RCS Rail Climbing Formwork system are put to use to accomodate the narrow width of the warehouse space along the side of the road.
The construction of the liftcores are made possible with CB240 Climbing Formwork system and PD8 Table system seen here are used for the beam.
An overview of the PD8 Table system being used to support as back propping for the precast plank installation and also topping up concrete casting.
Both CB 240 Climbing Formwork and VARIO GT 24 Column Formwork systems are visible on the 2nd floor of the warehouse as they are used for liftcores and staircases respectively.
An upclose view of CB 240 Climbing Formwork system in the background and VARIO GT 24 Column Formwork system in the foreground.
A closer look of CB 240 Climbing Formwork system climbing ahead of the slabs.
A liftcore for both cargo and passengers lift were seen using the PERI CB 240 Climbing Formwork system.
RCS Rail Climbing Formwork system are put to use to accomodate the narrow width of the warehouse space along the side of the road.
Mr. Yeong Chung Kong
Project Manager
We have make a good choice of choosing PERI for our project as the PERI systems we used are fast, convenient and better workable than using the conventional formwork.