A new Manufacturing Centre and Research & Development Hub located in the west part of Singapore is expected to open in September 2018. With the new 4-Storey hub of 18,000 square metres of land space, it will adopt advanced technologies in smart manufacturing.
Location
Main Application
Industrial Structures
Project participants
Main Contractor: Obayashi Singapore Pte Ltd
Sub-contractor: Chian Teck Realty Pte Ltd
Sub-contractor: Chian Teck Realty Pte Ltd
The Project
Impressions from the project process
Large PD 8 Tables are designed to maximize workers' productivity resulting in lesser handling.
Workers are caught in action of assembling the VARIO GT 24 Column Formwork.
A few of VARIO GT 24 Column Formwork that are in midst of assembling.
A good example of lifting PERI materials is by using nylon belt so as to prevent any minor dent to the materials.
Together with VARIO GT 24 Column Formwork, PERI Birch Plywood is also used to cast the columns. With PERI Birch Plywood, it will result in a high quality concrete finishing.
Casting of the liftcores using both VARIO GT 24 Wall Formwork & CB 240 Climbing Systems.
Large PD8 Table, the cost-effective shoring for slab tables and high loads.
Large PD8 Table - With the frame heights, as well as the large spindling lengths, each height is continuously adjustable up to the maximum.
The finish look of the columns and slabs at the ground floor.
An overview of the jobsite with PERI systems that are visible from afar.
Large PD 8 Tables are designed to maximize workers' productivity resulting in lesser handling.
Workers are caught in action of assembling the VARIO GT 24 Column Formwork.
A few of VARIO GT 24 Column Formwork that are in midst of assembling.
A good example of lifting PERI materials is by using nylon belt so as to prevent any minor dent to the materials.
Together with VARIO GT 24 Column Formwork, PERI Birch Plywood is also used to cast the columns. With PERI Birch Plywood, it will result in a high quality concrete finishing.
Casting of the liftcores using both VARIO GT 24 Wall Formwork & CB 240 Climbing Systems.
Large PD8 Table, the cost-effective shoring for slab tables and high loads.
Large PD8 Table - With the frame heights, as well as the large spindling lengths, each height is continuously adjustable up to the maximum.
The finish look of the columns and slabs at the ground floor.
An overview of the jobsite with PERI systems that are visible from afar.
Mr Liu Jian Zhong
Project Director, Chian Teck Realty Pte Ltd
Given the tight schedule and short period of time to assembly, PERI systems we used provides quick solution and saves manpower on site. It took us 7 days faster to cast than using the conventional formwork.