Marina Reservoir Chambers, Singapore
Marina Reservoir, Singapore
As part of the Masterplan, The Public Utilities Board (PUB) of Singapore is constructing water pipelines crossing Marina Reservoir from Marina South to Marina East.
The work requires supplying, lay and installing reinforced concrete pipes and the construction of permanent chambers.
PERI Singapore is proud to have worked on the 2 nos. of permanent chambers.
Location
Main Application
Water Retaining Structures
Project participants
Main Contractor: HSC Pipeline Engineering
The Project
Impressions from the project process
GRV Formwork installation and ready for casting
7.2m high PERI UP staircase to access to the bottom of the chamber
Pre-assembled GRV panel with a radius curvature of 12.5m
PERI Singapore thanks HSC Pipeline Engineering for the great partnership









GRV Formwork installation and ready for casting

7.2m high PERI UP staircase to access to the bottom of the chamber

Pre-assembled GRV panel with a radius curvature of 12.5m

PERI Singapore thanks HSC Pipeline Engineering for the great partnership