Singapore Sports Hub
Kallang,
Singapore
Construction duration: 3 years, 7 months
High of the dome: 80 m
Diameter: 312 m
55.000 seats
Location
Main Application
Cultural Buildings
Project participants
Customer: Dragages Singapore Pte Ltd
The Project
Impressions from the project process
Singapore Sports Hub
Safe working at great hights
PERI provides optimal solutions
Errection of scaffold on ground
Singapore Sports Hub under construction
Singapore Sports Hub
Safe working at great hights
PERI provides optimal solutions
Errection of scaffold on ground
Singapore Sports Hub under construction
Mr Abhimandran Harendran / Mr Bernward Stube
Project Coordinator, Yongnam Engineering and Construction / Director, Dulan Asia Pacific Pte Ltd
The PERI UP Rosett Flex has proven to be a safe, flexible and productive system which supports and faciliates the installation of the structural steel roof for the stadium of the Singapore Sports Hub.