Wave 9
Woodlands,
Singapore
Property consists of 100 units which vary in sizes
Units are specifically designed for light industrial use
7 m floor-to-ceiling height
Location
Main Application
Industrial Structures
Project participants
Customer: Yee Hong Pte Ltd
The Project
Impressions from the project process
Overview of Wave 9 industrial development
RCS Rail Climbing System, VARIO GT 24 Column Formwork, PD 8 Slab Tables, CB Climbing System as platform
CB Climbing System is attached to the lift core which is a few storeys above the construction level
PERI UP Flex – Tables for ramp beam & slabs
VARIO GT 24 Column Formwork | VARIO GT 24 Wall Formwork being hoisted
Columns | VARIO GT 24 Column Formwork - continuously adaptable, for architectural concrete surfaces and high concrete pressures
Overview of Wave 9 industrial development
RCS Rail Climbing System, VARIO GT 24 Column Formwork, PD 8 Slab Tables, CB Climbing System as platform
CB Climbing System is attached to the lift core which is a few storeys above the construction level
PERI UP Flex – Tables for ramp beam & slabs
VARIO GT 24 Column Formwork | VARIO GT 24 Wall Formwork being hoisted
Columns | VARIO GT 24 Column Formwork - continuously adaptable, for architectural concrete surfaces and high concrete pressures
Mr Edgar L. Salamatin
Site Manager
This is our 5th project for which we use PERI products. The system for which PERI products are designed and the ease of installations make us complete more structural elements thus increasing our construction productivity.