You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

RGT2 LNG Tank, Pengerang, Johor

Project data

Location: Pengerang, Malaysia

The re-gasification terminal (known as RGT-2) is part of Malaysia's development plan to secure stable natural gas supply for the nearby refinery and Petrochemical Integrated Development (RAPID), Pengerang Co-generation Plan (PCP) and also to the Peninsular Gas Utilization (PGU) Grid. This LNG Tank will have the capacity of 5 million tons per annual and two 200,000 cubmic meter LNG storage tank

Requirements

  • to withstand the pressure from within (outer tank diameter of 89.40m and the overall pouring heigh of 4.5m) when completed.
  • to be completed by April 2018.

Customer

Samsung C&T Corporation 

Customer's benefit

  • reduced labour costs thanks to accelerated construction process
  • compliance with high safety requirements
  • manage to finish the entire wall casting in only 8 sequences.
Mr. Alex Seo
Civil Manager

We are satisfied with PERI formwork not only the material but also their continuous technical support at site.  PERI system are versatile and easy to handle during assembly, jumping and rectifying.

PERI solution

  • to provide a package of solutions consisting of formwork, scaffolding, logistical and technical services throughout the project.
  • in addition to the planning of formwork and scaffolding solution for the complex geometries and high loads, strict compliance of the construction schedule and staying within the planned budget.