PSA Supply Chain Hub
Tuas Port,
Singapore
The PSA Supply Chain Hub at Tuas Port is nearing completion and we're glad to have supported the journey of bringing this landmark development to life.
At 18.6 hectares, the regional distribution centre and container freight station will be one of Singapore's most significant logistics infrastructure projects, featuring automated storage systems and facilities for handling sensitive goods.
To support a project of this scale, PERI Singapore supplied over 40,000m² of PERI UP MD (PS100 Shoring). The site crew appreciated its ease of assembly, transportation, lifting and disassembly — a reflection of how the right shoring solution can meaningfully improve efficiency on site.
Special thanks to main contractor Soilbuild Construction Group Ltd and subcontractor Ding Xin Construction for the trust, collaboration, and partnership throughout this project.
Sub-contractor: Ding Xin Construction
-
- CB Climbing Formwork for 50+ meter-high columns
-
- CB Climbing Brackets allow for safe, rapid, and versatile vertical climbing
Overview of project site PSA Supply Chain Hub – January 2026
Slab support in progress for level two
Components of PERI UP MD (PS100 Shoring) require minimal storage space
14 meter-high shoring support for level three
Site crew assembling PERI UP MD (PS100 Shoring) swiftly with ease
Tower assembled and ready to be crane-lifted into position
In preparation of tabletop with Alubeam AB225
Overview of PERI UP MD (PS100 Shoring)
Mixed of Alubeam AB225 as primary and VT20 as secondary girders
Slab casted, in progress of striking
Another view of the 14 meter-high PERI UP MD (PS100 Shoring) at level three
Trolley facilitating moving of the shoring tables
Over 40,000m2 of shoring supplied to PSA Supply Chain Hub
PERI safety banner supplied to the PSA Supply Chain Hub project site
PERI Singapore thanks maincon Soilbuild Construction and subcon Ding Xin Construction for the valued partnership throughout the project
Overview of project site PSA Supply Chain Hub – January 2026
Slab support in progress for level two
Components of PERI UP MD (PS100 Shoring) require minimal storage space
14 meter-high shoring support for level three
Site crew assembling PERI UP MD (PS100 Shoring) swiftly with ease
Tower assembled and ready to be crane-lifted into position
In preparation of tabletop with Alubeam AB225
Overview of PERI UP MD (PS100 Shoring)
Mixed of Alubeam AB225 as primary and VT20 as secondary girders
Slab casted, in progress of striking
Another view of the 14 meter-high PERI UP MD (PS100 Shoring) at level three
Trolley facilitating moving of the shoring tables
Over 40,000m2 of shoring supplied to PSA Supply Chain Hub
PERI safety banner supplied to the PSA Supply Chain Hub project site
PERI Singapore thanks maincon Soilbuild Construction and subcon Ding Xin Construction for the valued partnership throughout the project