Kuraray Production Facility
Jurong Island,
Singapore
PERI Singapore supplied column, wall, and shoring solutions for Kuraray’s latest expansion project—the EVAL™ Production Facility on Jurong Island, Singapore.
With limited working space on site, a handset formwork system was required for the casting of walls and columns. DUO proved to be the ideal solution, providing an efficient and flexible system for the confined work areas. It was used for columns up to 7 meters high and walls up to 7.5 meters in length.
For slab and beam shoring, the ST 100 Stacking Tower was deployed for heights of up to 4 meters. Its intuitive stacking design and minimal number of components enabled quick and efficient assembly, helping to improve productivity on site.
PERI Singapore extends our appreciation to (subcon) Toyah Construction & Engineering for their trust and valued partnership on this project.
Supporting the construction of Kuraray’s latest expansion project—the EVAL™ Production Facility on Jurong Island, Singapore. DUO is used for the casting of walls and columns while ST100 supported shoring of slab and beams.
-
- DUO for columns and walls
-
- ST100 Shoring for slab and beam
DUO was the primary formwork solution used throughout the Kuraray EVAL™ Production Facility project
Due to the limited space on site, DUO's lightweight handset design made it the ideal formwork solution
ST100 Shoring used for slab and beam
DUO is a crane-independent system, allowing panels to be handled easily by hand
DUO was the primary formwork solution used throughout the Kuraray EVAL™ Production Facility project
Due to the limited space on site, DUO's lightweight handset design made it the ideal formwork solution
ST100 Shoring used for slab and beam
DUO is a crane-independent system, allowing panels to be handled easily by hand