Tank Maintenance Work
Chestnut Avenue,
Singapore
For tank maintenance works, safe and reliable access is essential for site personnel to carry out their tasks.
PERI UP Access Platform was installed for this project, with a structure measuring 8m wide and 8.5m high. The scaffold was quickly assembled by the site crew and features toeboards and closely fitted decking with no gaps to support safe working conditions.
With its practical design and efficient assembly, PERI UP provides a suitable access solution for maintenance works at height.
-
- 8 meters wide and 8.5 meters high PERI UP Access Platform supplied
-
- Safe working platform to conduct maintenance of tank
Completed installation of PERI UP Access Scaffold, measuring 8 meters wide and 8.5 meters high
Easy, intuitive and fast assembly
Fourth level decking completed, in preparation for installing the verticals
Gravity lock ledgers enabling fast and secure connections
Completed installation of PERI UP Access Scaffold, measuring 8 meters wide and 8.5 meters high
Easy, intuitive and fast assembly
Fourth level decking completed, in preparation for installing the verticals
Gravity lock ledgers enabling fast and secure connections