You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Rochester Commons, Singapore

Project data

Location: Rochester Park, Singapore

Rochester Commons in Singapore’s one-north is set to become a first-of-its-kind integrated campus-style development set on 2.4 hectares of lushly landscaped grounds.

The building will include a 17-storey Grade A office tower, Catapult – a shared executive learning centre and Citadines Connect – a 135 room business hotel.

The project commenced in Q2 2019 and is expected to be completed by Q3 2022.

Requirements

  • 3 corewalls consisting of 34 platforms
  • Combination of RCS carriage for external and RCS towers for internal

Customer

Chian Teck Realty Pte Ltd

Customer's benefit

VARIO GT 24 Girder Wall Formwork - Easily adaptable to suit every size, concreting height and required fresh concerete pressure.

RCS Rail Climbing System – Through rail-guided climbing, the climbing unit is securely connected to the building at all times which makes the climbing procedure fast and safe also in windy conditions.

PERI UP Flex Shoring – Highly flexible through the uniform grid size. Adaptable to suit almost all geometries and loads.

Mr Yan Ting Hui
Site Supervisor

We have been working alongside with PERI for quite some time now. PERI systems efficiently increases the productivity on site by approximately 20%. Assembly and installation of the systems were fast and easy. With PERI systems in use, lesser manpower is needed on site.

PERI solution

  • VARIO GT 24 Girder Wall Formwork for corewall and staircase
  • RCS Rail Climbing System for corewall and staircase
  • PERI UP Flex Shoring for slab