You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

The GEAR, Singapore

Project data

Location: Changi Business Park, Singapore , Singapore


A 7-storey building spanning 13,088sqm is being built in the eastern region of Singapore.

The GEAR (Kajima Global Hub) is Kajima Corporation’s first and overseas Innovation Center which will also serve as its Asia Pacific HQ. The Hub will consist of a business park space, R&D lab space and double volume construction lab space in Changi Business Park.

Construction commenced in Q2 2021 and is scheduled to be completed in Q1 2023.

 

Requirements

  • 5.30m column height on first storey
  • 3.30m column height on typical floor
  • Shear Walls
  • Lift core
  • Staircase

Customer

Trust-Build Engineering & Construction Pte Ltd

Customer's benefit

The customer benefitted from:

VARIO GT 24 Girder Wall Formwork - Easily adaptable to suit every size, concreting height and required fresh concerete pressure.

VARIO GT 24 Girder Column Formwork – Always a project-specific solution consisting of formwork girders, steel walers and any selected formlining.

SB Brace Frame - Transfers the fresh concrete pressure into the sub-structure and foundations during single-sided concreting of structural elements.

CB 240/160 Climbing System – The CB climbing system allows fast moving and easy adjustments. The system was used for staircase and corewall.

PD 8 Table System – Large spindle extensions enables quick adaptions to accommodate different slab heights as well as being lowered for moving under large beams.

ST 100 Stacking Tower – Achieve fast assembly and dismantling. With a single frame type, all required assembly heights can be realized.

Aluminium Beam - Modern alternative to traditional timber beams for formwork and falsework applications and provide great economics over their long service life.

 

Mr Yaseer
Project Engineer

PERI Singapore provided with timely Engineering support for our project. The Design Engineers were patient and fufilled our requests. With PERI systems, about 10% of time and manpower was reduced. This is a significant progress. We are overall happy and satisfied with PERI’s support.

PERI solution

  • VARIO GT 24 Girder Wall Formwork + CB 240 Climbing Brackets for shear walls, lift core and staircase
  • VARIO GT 24 Girder Column Formwork for 5.30m and 3.30m column height
  • PD 8 + AluBeam + GT Girders for shoring
  • ST 100 Stacking Tower for high shoring with double volume