Samwoh Smart Hub, Singapore

Project data

Location: Kranji Way, Singapore

Samwoh Smart Hub – the first positive energy industrial building in Singapore. The 4-storey building located at Kranji way aims to reduce energy consumption to its minimum and plans to offset it with on-site solar power.

The positive energy smart hub is also constructed using various types of recycled construction materials such as recycled concrete aggregates (RCA), repurposed sedimentary rocks from the Jurong Rock Cavern, green cement and manufactured sand (M-sand).

Construction works commenced in Q1 2019 and was completed in Q1 2021.   

Requirements

  • Bunker wall

Customer

Hua Siah Construction Pte Ltd

Customer's benefit

VARIO GT 24 Girder Wall Formwork - Easily adaptable to suit every size, concreting height and required fresh concerete pressure.

CB 240/160 Climbing System  – Eliminating the need to erect scaffold from 1st casting to 3rd casting, thus reducing the need for manpower and achieve fast moving cycles.

PERI solution

  • VARIO GT 24 Girder Wall Formwork for bunker wall
  • CB 240 Climbing System for external
  • CB 160 Climbing System for internal