Project data

Location: Paya Lebar, Singapore

Expected Completion Year: second half of 2018 onward

Commercial & Residential Development

Paya Lebar Quarter is an urban mixed-use development compromising of 3 grade A office towers with close to 1 million square feet, a retail mall with over 340,000 square feet and 3 residential towers with 429 apartments which is directly connected to the Paya Lebar MRT Station. It will be a new bustling regional business hub with a peculiar sense of place and cultural identity.

Requirements

Plot A:

  • Auto climbing systems for lifts & staircases
  • Tableform for slab
  • Hoisting platform for crane lift
  • Logistic Corridor for vehicle to access to transport soil from basement
  • Cantilever Slab - to avoid the canal excavation work

Plot B & D:

  • Building perimeter protection
  • Formwork Instructor available for night shift

Customer

Plot A: Zhang Hui Construction Pte Ltd

Plot B & D: Hexacon Construction Pte Ltd

Customer's benefit

  • Plot A: Reliable, Cost Efficient, Safe
  • Plot B & D: Installation of the protection screen facing the MRT station and viaducts is made possible without the need of LTA  (Land Transport Authority of Singapore)'s application for mobile crane.

PERI solution

Plot A:

  • Logistic Corridor - Fast & easy solution for workers to assemble on the jobsite
  • PERI VARIOKIT Cantilever Slab - Cantilevers are extended to 2 m above ground

Plot B & D:

  • Due to the close proximity of the building from Paya Lebar MRT Station and its viaducts, crane reach is limited. With PERI RCS P Climbing System and a collaboration with Hexacon’s engineers, the perimeter protections facing the MRT station and its viaduct are installed without the use of tower crane.