MH-03 Contract 02 Proposed Sewers, Singapore

Project data

Location: Upper Changi Road East, Singapore

Construction of new sewers (17 meters deep shaft) at Upper Changi Road East, Singapore.

Used water from households, industries and commercial premises island-wide is collected and conveyed via an extensive reticulation system of sewers (like the mentioned project above) located underground for treatment at water reclamation plants.

The project commenced in Q2 2017 and is expected to complete in Q2 2021.

Requirements

  • Circular Shaft
  • Vortex Wall
  • Roof Slab

Customer

Ed. Züblin AG - Singapore Branch

Customer's benefit

GRV Articulated Waler Circular Formwork - Fast, efficient, and safe casting of circular walls.

PERI UP Flex Shoring - Highly flexible through uniform grid size. Adaptable to suit almost all geometries and loads.

PERI solution

  • GRV Articulated Waler Circular Formwork for circular wall
  • PERI UP as a working platform and for slab shoring