Bishan Depot Upgrade R1012, Singapore

Project data

Location: Bishan, Singapore

A contract for the Design and Construction of Stabling and Maintenance Workshop Extension at Bishan Depot (Contract R1012) was awarded to Gammon Construction Limited (Singapore Branch) in August 2019.

Upgrading works commenced in August 2019 and CCW 'Completion of whole of the works' is scheduled to be on 25 March 2023.

Requirements

  • 1 time casting of 11.5m columns
  • 3 levels of working platform – to provide special access staircase layout
  • Staggered staircase locations

Customer

Main con: Gammon Construction Limited (Singapore Branch)

Sub con: Heng Da Construction Pte Ltd

Customer's benefit

VARIO GT 24 Girder Wall Formwork - Easily adaptable to suit every size, concreting height and required fresh concerete pressure.

PERI UP Flex Shoring – Highly flexible through the uniform grid size. Adaptable to suit almost all geometries and loads.

PERI solution

  • VARIO GT 24 Girder Column formwork for 11.5m columns
  • Push-pull props for support