Applied Materials, Singapore - A&A Works

Project data

Location: Upper Changi Road, Singapore

Addition and Alteration works were required for the existing 5-storey Applied Materials factory building at Upper Changi Road, Singapore. Construction for the addition commenced in Q1 of 2020 and was completed in Q1 2021.

Requirements

  • 2 Staircase
  • 1 Corewall

Customer

Erecon Construction Co Pte Ltd

Customer's benefit

VARIO GT 24 Girder Wall Formwork - Easily adaptable to suit every size, concreting height and required fresh concerete pressure.

CB 240/160 Climbing System – The CB climbing system allows fast moving and easy adjustments. The system was used for staircase and corewall.

ST 100 Stacking Tower - Quick assembly, easy handling and minimal planning. With a single frame type, all required assembly height can be easily achieved.

PERI UP Flex Shoring – Highly flexible through the uniform grid size. Adaptable to suit almost all geometries and loads.

PERI solution

  • VARIO GT 24 Girder Wall Formwork for corewall and staircase
  • CB240/160 Climbing System for staircase and corewall
  • ST 100 Stacking Tower & PERI UP Flex Shoring for slab and beam support