A forming PERI shoring solution enables the efficient fabrication of two reinforced concrete ramps parallel to the railway tracks, both 100 m long.

Date
02. June 2017
The continuously climbing MDS decking ensures safe and thus accelerated assembly sequences for all scaffolding and formwork operations.

Download Press Release

The images in more detail

The following is an overview of the images contained in the press set