PERI system parts can be rented and easily erected and so lead to considerable cost and time benefits, particularly for temporary use in existing buildings.

Date
03. August 2015
The reinforced concrete props were refurbished with the SPCC dry-mix shotcreting procedure while PERI UP heavy-duty props ensured the safe bracing of the underground garage beams.

Download Press Release

The images in more detail

The following is an overview of the images contained in the press set