Date
02. February 2015
The images in more detail
The following is an overview of the images contained in the press set
PERI UP Rosett Flex in combination with VARIOKIT system components offered optimal working conditions when the insulation work on the dedusting system of blast furnace 9 was carried out.
The PERI UP Rosett Flex modular-type scaffold was completed by the VARIOKIT modular system to become a holistic PERI system solution. Both systems can be ideally combined due to the standardized 25 cm or 12.5 cm grids.
The VARIOKIT truss framework bridged the non-load-bearing flat roof and provided economic access to the plant parts which are above.
PERI UP Rosett Flex can be combined with VARIOKIT in almost unlimited ways because of the compatible basic grids and standardized fasteners.
PERI UP Rosett Flex fulfils strictest requirements – both regarding its use as well as during scaffold erection.
Dedusting system blast furnace 9, ThyssenKrupp Steel Europe, Duisburg
PERI UP Rosett Flex in combination with VARIOKIT system components offered optimal working conditions when the insulation work on the dedusting system of blast furnace 9 was carried out.
Highest security during the insulation work on the casthouse dedusting system
The PERI UP Rosett Flex modular-type scaffold was completed by the VARIOKIT modular system to become a holistic PERI system solution. Both systems can be ideally combined due to the standardized 25 cm or 12.5 cm grids.
VARIOKIT truss framework provides safe access
The VARIOKIT truss framework bridged the non-load-bearing flat roof and provided economic access to the plant parts which are above.
Cost-effective combinations
PERI UP Rosett Flex can be combined with VARIOKIT in almost unlimited ways because of the compatible basic grids and standardized fasteners.
Safety during erection
PERI UP Rosett Flex fulfils strictest requirements – both regarding its use as well as during scaffold erection.